STS

The ECO-STS200/500-C cabinet is designed to work with ESS cabinets, enabling seamless off-grid switching within 20 ms during utility interruptions to ensure the safety of critical loads. With dedicated ports for PV inverter and critical loads connections, it allows PV systems and loads to continue operating normally under off-grid conditions.